Projects & Infrastructure

Four Project Verticals. One Integrated Platform.

Induenergy Industrial Park and Free Zone hosts four interconnected project verticals across 45 hectares of owned land in Santa Marta, Colombia — power generation, liquid fuels, LNG, and water desalination.

45 ha

Owned Land

Santa Marta

Colombia

Overview

Colombia's Only Integrated Petro-Energy Platform

Induenergy's 45 hectares of owned land host an interconnected cluster of energy infrastructure projects — each fully permitted, each reinforcing the others, and each representing a distinct investment opportunity within the park.

Available Facilities

Facility Types

NENCOL Power Projects

Colombia's only power generation hub on the Caribbean coast. Four thermal projects totaling 2,519 MW — from the 93 MW auction-ready units to TermoInduEnergy, Colombia's largest thermal project targeting the December 2028 Firm Energy Auction.

TermoInduEnergy2,240 MW — Development
TermoCosta93 MW — Auction Ready
TermoBonda93 MW — Auction Ready
TermoGaira93 MW — Auction Ready

INTEROILCO — Liquid Fuels

Colombia's premier liquid fuel import and storage hub. A 1.5 million barrel tank farm connected via 14 km pipeline to Santa Marta Port enables Aframax vessel offloading. Strategic location minimizes transport costs to major consumption centers.

Tank farm capacity1.5M barrels
Throughput100K BPD
Port draft depth60 ft
Operational targetQ4 2027

INTERGASCO — LNG Imports

Aggregates a major LNG supplier to install a Floating Storage and Regasification Unit (FSRU) at Santa Marta Port. Feeds directly into the Promigas national gas pipeline — fueling the thermal power fleet and regional gas demand.

LNG storage170,000 m³
Regasification400,000 MCF/day
FSRU locationSanta Marta Port
Operational targetQ4 2026

Utilities & Services

Industrial-Grade Infrastructure

MARTAGUA — Water Desalination

Colombia's only water desalination plant. A PPP structure delivers 30,000 m³/day (10 million gallons/day) of pure water to Santa Marta — the only viable long-term solution for guaranteed uninterruptible water supply to the city.

500 kV Transmission Infrastructure

UPME-awarded 500 kV transmission line to El Copey Substation supports TermoInduEnergy's 2,240 MW output. A 115 kV line to Termocol Substation serves the 93 MW auction-ready projects.

Deep Water Port Connectivity

Connected to Santa Marta Port via a 14 km, 30-meter right-of-way corridor — enabling pipeline and FSRU access for Aframax vessels (up to 100,000 DWT) and LNG carriers.

Rail & Road Infrastructure

10 km rail connection to Colombia's only national rail system enables liquid fuels transport to Cesar mines. Industrial-grade internal road network with direct external highway access.

Request a Project Briefing

Our team will provide detailed project documentation, financial models, and investment structures for each vertical within the Induenergy platform.

Contact Our Team